
I love the smell of jet fuel in the morning...
|
 |

At the Boeing Company duties included 767-200-300-400
line of aircraft: The beginning testing and documentation process for Flight Deck Security, IFE cooling system (pcb card), Door heating system,
Electrical / Electronic cooling system.
|
|
 |

This is a picture of an iu22 Philips ultrasound device I have worked
on in the R&D lab at the Bothell facility in
2004 as the product was going through final testing stages.
|
 |

Flight deck security door program
I worked on at the Boeing Company....
Enhanced security doors need to
do more than withstand massive blunt force. They also must resist bullets and shrapnel while simultaneously complying with
U.S. rules on cabin decompression standards and emergency exit for pilots.
|
|